HomeAboutStudentsFaculty and StaffContactDirections

The Gray Bridge Print E-mail

The Gray Bridge ConstructionThe Gray Bridge consists of a stress-laminated deck structure using CCA-treated #2 or better 2x14 rough-sawn Eastern Hemlock laminations. These laminations were placed on edge side by side across the span. High-strength steel bars were placed through prebored holes in the laminations and post-tensioned. The interlaminar friction thus generated allows the deck to act as an orthotropic plate. A 7-year monitoring report is available, which shows excellent performance of the bridge.

 

Specifications

  • Year Constructed: 1991
  • Length: 23 ft.
  • Width: 23.67 ft.
  • Design Live Load: HS20-44
  • Wood Species: CCA-Treated Eastern Hemlock
  • FRP Tensile Strength: NA
  • FRP Tensile Modulus: NA
  • FRP Material Suppliers: NA

Sponsored by: US Department of Agriculture Wood in Transportation Initiative, Maine Department of Transportation

 

 
UMaine 
Logo
An ISO 17025 Accredited Laboratory
(207) 581-2123
composites@umit.maine.edu