|
Existing Bridge to be Modified
In this project, Fiber-Reinforced Polymer (FRP) and Oriented Strand Board (OSB) will be used to develop panels for temporary bridge decking. The goal of the project is to improve contractor-designed/built temporary bridges.
Specifications
* Year Constructed: Summer 2001 (depending on funding)
* Length: 50 ft.
* Width: 28 ft.
* Design Live Load: HS20
* Wood Species:
* FRP Tensile Strength:
* FRP Tensile Modulus:
* FRP Material Suppliers:
Sponsored by: Federal Highway Administration Innovative Bridge Research
and Construction Program, Maine Department of Transportation
|