The Sibley Pond Bridge Print E-mail

The Sibley Pond Bridge Existing Bridge to be Modified
 
This project will involve wrapping existing concrete piles with Fiber-Reinforced Polymer (FRP) . The goals are to add strength, ductility and protection to the existing piles.

 

Specifications

    * Year Constructed: Fall 2000 (depending on funding)
    * Length: NA
    * Width: NA
    * Design Live Load: HS25
    * Wood Species:
    * FRP Tensile Strength:
    * FRP Tensile Modulus:
    * FRP Material Suppliers:

Sponsored by: Federal Highway Administration Innovative Bridge Research and Construction Program, Maine Department of Transportation

 

 