|
The Statewide Bridge Reconstruction Project |
|
|
|
Existing bridge drains and grates will be replaced with Fiber-Reinforced-Polymer (FRP) bridge drains and grates cast in concrete. The project goal is to reduce maintenance costs by eliminating contact of steel drains with deicing salts.
Specifications
- Year Constructed: Summer 2000
- Length: varies
- Width: varies
- Design Live Load: HS25
- Wood Species: NA
- FRP Tensile Strength: NA
- FRP Tensile Modulus: NA
- FRP Material Suppliers: NA
Sponsored by: Federal Highway Administration Innovative Bridge Research
and Construction Program, Maine Department of Transportation
|