|
The Statewide Bridge Reconstruction Project |
|
|
|
Existing bridge drains and grates will be replaced with Fiber-Reinforced-Polymer (FRP) bridge drains and grates cast in concrete. The project goal is to reduce maintenance costs by eliminating contact of steel drains with deicing salts.
Specifications
* Year Constructed: Summer 2000
* Length: varies
* Width: varies
* Design Live Load: HS25
* Wood Species: NA
* FRP Tensile Strength:
* FRP Tensile Modulus:
* FRP Material Suppliers:
Sponsored by: Federal Highway Administration Innovative Bridge Research
and Construction Program, Maine Department of Transportation
|